Executive Summary & Table of Contents Section 1 Introduction Section 2 The Site Section 3 Scope of Applications & Estate Concept Plan Summary Section 4 Central Concept Plan Section 5 Estate Works + DHL Project Section 6 Statutory & Planning Context Section 7 Consultation and Identification of Key Issues Section 8 Environmental Impacts Section 9 Draft Statement of Commitments Section 10 Project Justification and Conclusion
A. Masterplanning & Architecture CP1.01(A) - CP1.03(A) PA1.01(A) - PA1.08(A) PA1.09(A) PA1.15(A)
B. Urban Design MP.01 – 03 MP.04 – 06 MP.07 – 09
C. Landscape 101.1(F) – 152.1(F) 153.1(F) – 601.1(B)
D. Civil Engineering SK003(C) Bulk Earthworks Plan 21-16225 Stormwater Drainage Strategy C011 Rev2 Erosion & Sediment Control Plan
E. Survey 111348005 Existing Site Survey Plan DP120673 Existing Title Plan
A Director-General’s Requirements and Reference Table B Soil and Water Management Plan C Stormwater Management Strategy D Sewage Management Strategy E Noise Assessment F Section 90 Consent G Traffic Assessment - Central Concept Plan H Traffic Assessment - DHL Project I Urban Design and Landscape Report_Part 1 I Urban Design and Landscape Report_Part 2I Urban Design and Landscape Report_Part 3I Urban Design and Landscape Report_Part 4
Specialist Studies A Geotechnical and Hydrogeological Assessment B Phase 1 Contamination Assessment C Limited Scope Phase 2 Contamination Assessment D Riparian Areas Assessment E Ecological Assessment F Noise Assessment G Aboriginal Heritage Assessment G Aboriginal Heritage Assessment_Appendix A_Part 1G Aboriginal Heritage Assessment_Appendix A_Part 2 G Aboriginal Heritage Assessment_Appendix A_Part 3 G Aboriginal Heritage Assessment_Appendix A_Part 4 G Aboriginal Heritage Assessment_Appendix B H Historical Heritage Assessment H Historical Heritage Assessment_Appendices I Traffic Assessment J Infrastructure Concept Plan J Infrastructure Concept Plan_Appendix A_Water Balance Report_Part 1J Infrastructure Concept Plan_Appendix A_Water Balance Report_Part 2J Infrastructure Concept Plan_Appendix B_Sewer Servicing Strategy K Water Sensitive Urban Design Strategy L Bushfire Assessment M Landscape Concept Report_Part 1 M Landscape Concept Report_Part 2 N Urban Design Report